Implementations
Have a look at our implementations. If you are interested in our offer, contact us!
P3 Farna Airport Bratislava, Ivanka pri Dunaji
Size: 81 400 m2
Heating, gas, sanitary engineering, ventilation, air conditioning, measuring and controlling equipment
Mubea Automotive Slovakia - Production hall Kežmarok
Size: 10 000 m2
Heating, technological distribution of gas, cooling media and water, sanitary engineering, compressed air, measuring and controlling equipment
OERLIKON Balzers Coating Slovakia
Description: Production hall Stage 1.2. Veľká Ida
Solution: Heating, gas distribution systems, sanitary engineering , technological distribution systems
Železiarne Podbrezová a.s.
Description: Replacement of heavy fuel oil boilers K1 and K4 in the heating station of a new production plant in Železiarne Podbrezová a.s.
Solution: Implementation of a steam boiler 15t/hour combination gas/ oil
KIA Slovakia – welding facility
Implementation of technical equipment of buildings - technological distribution of compressed air, gas, technological distribution systems and distribution of TANK FARM fuels
Weerts, Nagytarcsa Hungary
Implementation of technical equipment of buildings – heating, sanitary engineering, air conditioning
Knaus Tabbert – production hall Nagyoroszi Hungary
Implementation of technical equipment of buildings – heating, cooling, gas, sanitary engineering, air conditioning and compressed air distribution systems.
GLP – logistics centre Szigetszentmiklós Hungary
Implementation of technical equipment of buildings – heating, cooling, gas, sanitary engineering, air conditioning and compressed air distribution systems.
CONTINENTAL Kaunas Lithuania
Complex engineering of technical equipment of buildings
Butovice Gallery – Shopping Centre Prague, Czech Republic
Implementation of cooling and heating distribution systems